Full industry chain coverage:
Self owned rubber mixing workshop (compliant with ISO 9001) → mold manufacturing (mirror polishing accuracy Ra0.1 μ m) → 100000 level dust-free injection molding workshop
Rapid response system:
Provide 3D printed samples within 48 hours (supporting on-site confirmation of T0 samples)
Complete small-scale trial production in 7 days (minimum order quantity of 500 pieces)
Cost control technology:
Multi cavity mold design (up to 128 holes) reduces single piece costs by 40%
Waste recycling system (waste rubber utilization rate ≥ 85%)